The temperatures outside have been ghastly and challenging but the second-floor exterior walls and framing of the roof are now…
Ron, Dave, Tim and Henry are working away to install floor and deck joists for the second floor. The weather…
Mother Nature tried to hinder our whole home remodel with the threat of snow but fortunately she was nice. We're…
The weather outside might be cold but here at DJL Builders Inc., we are just starting to warm with our…
We are breaking ground at Arthur Street. The excavator is digging out the basement and preparing for the foundation of…