Categories: Uncategorized

Small Space, Big Living

The inside of Roe Street has and is going through major changes. Since framing has been completed windows were installed and the rough mechanicals are in the process of being installed.

The rough plumbing, electrical and HVAC has been installed throughout the home.

After the rough mechanicals passed inspection, insulation was then added to home and the walls are ready to be drywalled. Once the drywall is installed, you can start to see more of how the layout of the home is going to look.

DJLbuildersmi

Recent Posts

When Is a Whole-Home Remodel the Right Choice?

Is your house no longer fitting your lifestyle? DJL Builders Inc. transforms your existing home…

2 weeks ago

How to Design a Bathroom That Works for Michigan Winters

Michigan winters can be tough on your home, and DJL Builders Inc. knows the bathroom…

2 months ago

Top 5 Remodeling Projects That Help Homes Sell Faster

If you’re thinking about selling your home in Plymouth, MI, the right remodeling projects can…

2 months ago

Home Additions That Give You More Space for Holiday Entertaining

The holidays are a time for gathering, and if your home feels cramped once guests…

4 months ago

Create the Perfect Kitchen for Thanksgiving Gatherings

Thanksgiving is a time for family, food, and memories — and the heart of it…

5 months ago

Turning Your Basement Into the Perfect Haunted House

Halloween is one of the most creative times of year, and what better place to…

6 months ago