The stone work and siding are now completed on Arthur Street here in Downtown Plymouth.
After the home was finished being sided and the stone work completed, the cement for the driveway, front and back steps, as well as the back patio was poured and set.
While the outside of the home was under construction, DJL Builders was still very busy on the inside working on installing the cabinetry throughout the home as well as various carpentry work.